Port of Miami Power Study for Shore Power

As a sub-consultant to the Prime Contractor, HyPower, Hall Engineering Group’s (HEG) role was to perform the power study defined by contract specification 26 05 74. HEG coordinated with HyPower, PowerCon (the substation designer/constructor), Elgin (the distribution switchgear designer/constructor), FPL and Port Miami to obtain the needed information to perform the system short circuit current and time current coordination studies (consisting of 51/50 Phase and Ground) recommended relay settings, an Arc Flash Hazard Analysis and Report and Arc Flash Hazard labels.